Be A Freedom Fighter · Bill Library

HR 10750 — Advanced Nuclear Fission and Fusion Propulsion Systems Act

Freedom score: -1 (scale −10 to +10)

Sponsor: Rep. Whitesides, George [D-CA-27] · Latest action: Referred to the House Committee on Armed Services. (2026-10-05)

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 5 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 1 — Short title. No operative liberty effect See in text ↓
  2. Sec. 2(a) · Government Power — Discretionary Air Force pilot. Within 180 days the Secretary of the Air Force, through Air Force Research Laboratory, may establish an in-space technology demonstration/risk-reduction program for advanced nuclear fission and fusion propulsion. Although the bill title says “to direct,” the actual operative verb is may, not shall See in text ↓
  3. Sec. 2(b)–(c) · Government Power — If established, objectives and selection. The Secretary must pursue national-security risk reduction and select technical participants emphasizing prototype progress and feasible demonstration time frames, only if the pilot is undertaken See in text ↓
  4. Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data See in text ↓
  5. Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text See in text ↓

Full text (introduced version)

18 of 18 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10750 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10750 To direct the Secretary of the Air Force to establish a pilot program to conduct in-space technology demonstrations regarding advanced nuclear fission propulsion systems and advanced nuclear fusion propulsion systems. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES October 5, 2026 Mr. Whitesides introduced the following bill; which was referred to the Committee on Armed Services _______________________________________________________________________ A BILL To direct the Secretary of the Air Force to establish a pilot program to conduct in-space technology demonstrations regarding advanced nuclear fission propulsion systems and advanced nuclear fusion propulsion systems. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

Sec. 1 — Short title. No operative liberty effect

This Act may be cited as the ``Advanced Nuclear Fission and Fusion Propulsion Systems Act''.

SEC. 2. SPACE TECHNOLOGY DEMONSTRATION OF ADVANCED NUCLEAR PROPULSION TECHNOLOGIES.

Sec. 2(a) · Government Power — Discretionary Air Force pilot. Within 180 days the Secretary of the Air Force, through Air Force Research Laboratory, may establish an in-space technology demonstration/risk-reduction program for advanced nuclear fission and fusion propulsion. Although the bill title says “to direct,” the actual operative verb is may, not shall

(a) Establishment.--Not later than 180 days after the date of the enactment of this Act, the Secretary of the Air Force, acting through the Commander of the Air Force Research Laboratory, may establish a pilot program to conduct in-space technology demonstrations, and related risk reduction technology development activities, with respect to both advanced nuclear fission propulsion systems and advanced nuclear fusion propulsion systems.

Sec. 2(b)–(c) · Government Power — If established, objectives and selection. The Secretary must pursue national-security risk reduction and select technical participants emphasizing prototype progress and feasible demonstration time frames, only if the pilot is undertaken

(b) Purpose.--If the Secretary carries out the pilot program under subsection (a), the Secretary shall carry out the pilot program in a manner that reduces technical risk and informs future development requirements relating to nuclear propulsion for national security missions in space, including potential operations beyond geosynchronous orbit, including in cislunar orbit.

Sec. 2(b)–(c) · Government Power — If established, objectives and selection. The Secretary must pursue national-security risk reduction and select technical participants emphasizing prototype progress and feasible demonstration time frames, only if the pilot is undertaken

(c) Selection.--If the Secretary carries out the pilot program under subsection (a), the Secretary shall select entities to carry out activities under the pilot program. In determining the criteria for making such selection, the Secretary shall emphasize previous subcomponent and prototype development and the ability to demonstrate within reasonable timeframes.

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(d) Demonstration Required.--If the Secretary carries out the pilot program under subsection (a), not later than three years after the date of the enactment of this Act, the Secretary shall conduct in-space demonstrations described in subsection (a), with oversight by the Air Force Research Laboratory Rocket Propulsion Division at Edwards Air Force Base, California.

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(e) Activities.--In carrying out the pilot program under subsection (a), the Secretary shall, at a minimum--

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(1) establish technical objectives and success criteria for the in-space demonstrations described in subsection (a);

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(2) develop a concept of operations and test and evaluation approach for the demonstrations;

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(3) conduct ground test activities necessary to support the demonstrations;

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(4) assist in the acquisition of launch services;

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(5) plan for collection and analysis of on-orbit data sufficient to assess propulsion performance, operability, and reliability; and

Sec. 2(d)–(e) · Government Power — Conditional demonstration activities. If activated, the Air Force shall carry out in-space demonstration within three years after enactment, ground testing, acquisition of launch services, objectives, test plans, collection and assessment of on-orbit performance data

(6) assess potential use cases for applications in cislunar operations pending the conclusion of the demonstrations.

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(f) Plan.--Before commencing the pilot program under subsection (a), the Secretary shall submit to the congressional defense committees (as defined in section 101(a)(16) of title 10, United States Code) a plan on the pilot program.

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(g) Report.--If the Secretary carries out the pilot program under subsection (a), not later than one year after the date of the enactment of this Act, the Secretary shall submit to the congressional defense committees a report on the pilot program. The report shall include--

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(1) a description of the activities carried out under the pilot program, including the planned demonstration concept of operations and the associated timeline;

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(2) the technical objectives and success criteria established under subsection (e)(1);

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(3) an assessment of major technical risks and planned risk-mitigation activities; and

Sec. 2(f)–(g) · Government Power — Planning/reporting. If the pilot is activated, requires a plan before commencement and a post-commencement report to Congress. No new appropriation amount, nondefense civilian licensing burden, environmental exemption or general private-contractor ban is in this text

(4) an assessment of parallel efforts by the People's Republic of China to develop and deploy advanced space propulsion technologies for strategic purposes. <all>

Findings source: bill-scores-v2-batch46-findings-2026-11-15.md. Highlights come only from that file; no finding, score, or provision was invented for this page.

What you can do

Contact your U.S. Representative and Senators about this bill.

Find your Representative Contact your Senators

Spot an error on this page? Report it.