HR 10809 — Make Data Centers Pay Act

Freedom score: 0 (scale −10 to +10)

Sponsor: Rep. Vindman, Eugene Simon [D-VA-7] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-10-13)

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 8 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 1 — supplies the short title See in text ↓
  2. Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity See in text ↓
  3. Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities See in text ↓
  4. Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue See in text ↓
  5. Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges See in text ↓
  6. Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics See in text ↓
  7. Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers See in text ↓
  8. Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized See in text ↓

Full text (introduced version)

17 of 17 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10809 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10809 To amend the Federal Power Act to protect ratepayers from costs relating to the electric loads of data centers and high-density computing facilities. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES October 13, 2026 Mr. Vindman introduced the following bill; which was referred to the Committee on Energy and Commerce _______________________________________________________________________ A BILL To amend the Federal Power Act to protect ratepayers from costs relating to the electric loads of data centers and high-density computing facilities. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

Sec. 1 — supplies the short title

This Act may be cited as the ``Make Data Centers Pay Act''.

SEC. 2. RATEPAYER PROTECTION FOR DATA CENTER AND HIGH-DENSITY COMPUTING LOAD.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: ``SEC. 224. RATEPAYER PROTECTION FOR DATA CENTER AND HIGH-DENSITY COMPUTING LOAD.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(a) Definitions.--In this section:

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(1) Commission.--The term `Commission' means the Federal Energy Regulatory Commission.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(2) Covered load.--The term `covered load' means electric load that-- ``(A) is attributable to 1 or more data centers or high-density computing facilities located at a single site, or at multiple sites under common ownership or control; and ``(B) equals or exceeds 20 megawatts or, in the case of data centers or high-density computing facilities developed in phases, is reasonably expected to equal or exceed 20 megawatts at full buildout.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(3) Data center or high-density computing facility.-- ``(A) In general.--The term `data center or high- density computing facility' means a facility, or group of colocated facilities, the primary purpose of which is to house computing, networking, or data storage equipment used to process, store, or transmit digital data, including equipment used for-- ``(i) artificial intelligence training or inference; ``(ii) cloud computing or data hosting; or ``(iii) cryptocurrency mining or other distributed-ledger or digital-asset computation. ``(B) Exclusion.--The term `data center or high- density computing facility' does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A).

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(4) Incremental cost.--The term `incremental cost' means the cost that would be avoided had a specific covered load not been served by the electric utility, including all costs to construct, own, and operate power generation or storage resources and electric transmission and distribution services associated with serving the covered load, based on costs estimated by the electric utility at or around the time that the covered load becomes operational and subject to approval by the Commission or a State, as appropriate.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(5) State.--The term `State' includes the applicable State commission and any other State authority having jurisdiction over retail electric service.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(b) Ratepayer Protection Floor.--

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(1) No subsidy of covered load.--No portion of the incremental cost may be allocated to, or recovered in the rates of, any customer other than a covered load.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(2) Surplus permitted.--Paragraph (1) does not limit the authority of the Commission or a State, under any other provision of law, to recover from covered loads amounts in excess of incremental cost and to credit those amounts to other customers as a rebate or a reduction to the utility costs that are used as a basis for the calculation of customer rates.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(3) Continuing recovery on exit.--A rate, charge, or agreement for service to a covered load shall be designed to recover from the covered load the full incremental cost of the electric utility, and such recovery shall continue notwithstanding the termination by the covered load of a contract or other agreement pertaining to the sale of electric energy, or the cessation by the covered load of the purchase of electric energy, before that incremental cost has been fully recovered.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(4) Financial assurance.--Before constructing, or making an upgrade to, a generation, transmission, or distribution facility necessary to serve a covered load, an electric utility shall require the covered load to provide financial assurances or contributions sufficient to cover the cost of the facility or upgrade, subject to the condition that any financial assurances or contributions provided by the applicable covered load to a public utility or Transmission Organization for the same facility or upgrade shall be credited against the requirement of this paragraph.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(c) Rule of Construction.--Except as expressly provided in subsection (b), nothing in this section expands or diminishes the jurisdiction of the Commission or of any State, including State authority over retail electric service, rate design, and resource planning.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(d) Applicability.--

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(1) Prospective application.--Subsection (b) applies to a covered load that interconnects on or after the date of enactment of this section.

Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity

Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities

Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue

Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges

Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics

Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers

Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized

``(2) Existing arrangements.--An arrangement to serve a covered load that was approved by the Commission or by a State before the date of enactment of this section shall remain in effect.''. <all>

Findings source: bill-scores-v2-batch42-findings-2026-11-15.md. Highlights come only from that file; no finding, score, or provision was invented for this page.