Sponsor: Rep. Vindman, Eugene Simon [D-VA-7] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-10-13)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 8 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 1 — supplies the short title See in text ↓
- Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity See in text ↓
- Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities See in text ↓
- Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue See in text ↓
- Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges See in text ↓
- Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics See in text ↓
- Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers See in text ↓
- Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized See in text ↓
Full text (introduced version)
17 of 17 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
Sec. 1 — supplies the short title
SEC. 2. RATEPAYER PROTECTION FOR DATA CENTER AND HIGH-DENSITY COMPUTING LOAD.
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Sec. 2, new Federal Power Act §224(a)(1)–(3) — defines FERC, covered load and data-center/high-density-computing facilities. The trigger is 20 MW or more from one site or multiple sites under common ownership/control, including phased projects reasonably expected to cross the threshold at full buildout. Coverage explicitly includes AI, cloud/hosting and cryptocurrency computation, but excludes computers ancillary to another primary industrial/commercial activity
Sec. 2, new §224(a)(4)–(5) — defines incremental cost as avoidable generation/storage/transmission/distribution costs attributable to covered load, estimated by a utility at or near service start subject to FERC or State approval as appropriate. "State" includes its rate regulator or other retail-service authority. The approved calculation will matter to the amount borne by covered facilities
Sec. 2, new §224(b)(1) — prohibits assigning or recovering any part of covered-load incremental costs through rates for customers other than covered load, creating a no-cross-subsidy floor. It is not a prohibition on data centers, nor a general tax on their gross revenue
Sec. 2, new §224(b)(2) — preserves an otherwise-existing regulator's ability to recover more than incremental cost from covered loads and credit the surplus to other customers; it is a permission-preservation clause, not an independent new duty to impose excess charges
Sec. 2, new §224(b)(3) — requires covered-load rates/contracts to recover the full incremental cost even if the data center ends its contract or stops buying electricity early. This changes allocation of stranded investment risk and contract exit economics
Sec. 2, new §224(b)(4) — requires preconstruction financial assurances or contributions sufficient for new or upgraded generation/transmission/distribution serving the load, with credit for assurances/contributions already provided to a public utility or transmission organization for the same improvement. The provision prevents double-counting but compels financial security from qualifying customers
Sec. 2, new §224(c) — leaves FERC/State jurisdiction unchanged except the express subsection-(b) rules; §224(d)(1)–(2) applies the new floor to covered loads interconnecting on/after enactment, while preserving previously regulator-approved service arrangements. No retroactive blanket cancellation is authorized
Findings source: bill-scores-v2-batch42-findings-2026-11-15.md. Highlights come only from that file; no finding, score, or provision was invented for this page.