Be A Freedom Fighter · Bill Library
HR 10851 — Socket Full of Sunshine Act
Freedom score: -3 (scale −10 to +10)
- Individual rights: 0
- Property rights: -1
- Economic freedom: 0
- Privacy & due process: -1
- Government power: -1
Sponsor: Rep. Menendez, Robert [D-NJ-8] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-10-19)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 23 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 2(a) · Individual Rights — proposed PURPA §111(d)(22): requires states to CONSIDER portable solar standards, not adopt them See in text ↓
- Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right See in text ↓
- Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity See in text ↓
- Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use See in text ↓
- Sec. 2(a) · Economic Freedom — PURPA §111(d)(22)(A): states consider exemptions from interconnection agreements and net metering and bans on utility prior approval, insurance, fees, or extra controls/equipment See in text ↓
- Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two See in text ↓
- Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions See in text ↓
- Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions See in text ↓
- Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000 See in text ↓
- Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold See in text ↓
- Sec. 3(g) · Economic Freedom — $100m authorized annually FY2027–2032, up to 10% admin/outreach; not guaranteed appropriation See in text ↓
- Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label See in text ↓
- Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification See in text ↓
- Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients See in text ↓
- Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime See in text ↓
- Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry See in text ↓
- Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption See in text ↓
- Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing See in text ↓
- Sec. 4 · Government Power — FTC voluntary label See in text ↓
- Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553 See in text ↓
- Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while See in text ↓
- Sec. 6(3)(F) · Government Power — uses >400 W See in text ↓
- Sec. 5 · Government Power — safety rule due within 60 days; no general sunset See in text ↓
Full text (introduced version)
49 of 57 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
SEC. 2. PORTABLE SOLAR GENERATION DEVICES.
Sec. 2(a) · Individual Rights — proposed PURPA §111(d)(22): requires states to CONSIDER portable solar standards, not adopt them
Sec. 2(a) · Economic Freedom — PURPA §111(d)(22)(A): states consider exemptions from interconnection agreements and net metering and bans on utility prior approval, insurance, fees, or extra controls/equipment
Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption
Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two
Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions
Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions
Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption
Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions
Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption
Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two
Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions
Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption
SEC. 3. DOE GRANT PROGRAM.
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right
Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity
Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use
Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right
Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right
Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use
Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
Sec. 3(g) · Economic Freedom — $100m authorized annually FY2027–2032, up to 10% admin/outreach; not guaranteed appropriation
Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing
SEC. 4. EXPECTED ELECTRICITY COSTS SAVINGS LABEL.
Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label
Sec. 4 · Government Power — FTC voluntary label
Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label
Sec. 4 · Government Power — FTC voluntary label
Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label
Sec. 4 · Government Power — FTC voluntary label
SEC. 5. CONSUMER PRODUCT SAFETY STANDARD FOR PORTABLE SOLAR GENERATION DEVICES.
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification
Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553
Sec. 5 · Government Power — safety rule due within 60 days; no general sunset
SEC. 6. DEFINITIONS.
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6(3)(F) · Government Power — uses >400 W
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Sec. 6(3)(F) · Government Power — uses >400 W
Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while
Findings source: bill-scores-v2-batch35-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.