Be A Freedom Fighter · Bill Library

HR 10860 — Stop Beijing's Bots Act

Freedom score: 0 (scale −10 to +10)

Sponsor: Rep. Biggs, Sheri [R-SC-3] · Latest action: Referred to the House Committee on Armed Services. (2026-10-22)

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 13 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture See in text ↓
  2. Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services See in text ↓
  3. Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules See in text ↓
  4. Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine See in text ↓
  5. Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities See in text ↓
  6. Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan See in text ↓
  7. Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal See in text ↓
  8. Sec. 2(b) · Government Power — Prohibits sensitive-environment operation after two years See in text ↓
  9. Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight See in text ↓
  10. Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices See in text ↓
  11. Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control See in text ↓
  12. Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components See in text ↓
  13. Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset See in text ↓

Full text (introduced version)

18 of 19 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10860 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10860 To prohibit the Department of Defense from acquiring or using certain robotic systems from People's Republic of China, and for other purposes. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES October 22, 2026 Mrs. Biggs of South Carolina introduced the following bill; which was referred to the Committee on Armed Services _______________________________________________________________________ A BILL To prohibit the Department of Defense from acquiring or using certain robotic systems from People's Republic of China, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the ``Stop Beijing's Bots Act''.

SEC. 2. PROHIBITION ON PROCUREMENT AND OPERATION OF COVERED ROBOTIC SYSTEMS.

Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services

(a) Prohibition on Procurement.--Not later than one year after the date of enactment of this section, the Secretary of Defense may not enter into or renew a contract for--

Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services

(1) the procurement of any covered robotic system; or

Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services

(2) equipment or service that includes any covered robotic system.

Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture

Sec. 2(b) · Government Power — Prohibits sensitive-environment operation after two years

(b) Prohibition on Operation.--Not later than 2 years after the date of enactment of this section, an element of the Department of Defense may not operate a covered robotic system in any sensitive operational environment.

Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture

Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules

(c) Limitation Relating to Lease or Operation of a Covered Robotic System.--

Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture

Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules

(1) In general.--No funds made available by the Department of Defense may be obligated or expended for the lease or operation of a covered robotic system.

Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture

Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules

(2) Effective date.--The prohibition under paragraph (1) shall take effect 1 year after the date of enactment of this section with respect to new leases, and 3 years after the date of enactment of this section with respect to the continued operation of covered robotic systems already in service.

Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine

Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities

Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan

Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight

(d) Waiver Authority.--

Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine

Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities

Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight

(1) In general.--The Secretary of Defense may waive the prohibition in subsection (a) or (b) on a case-by-case basis for renewable periods not to exceed 180 days if the Secretary determines that-- (A) there are no currently available and technically acceptable alternatives to the covered robotic system; (B) the covered robotic system is essential to an ongoing mission-critical operation; (C) the cost of replacement would result in an undue burden on the agency; (D) the Secretary has implemented risk-mitigation measures to address the national security risks presented by continued operation of the covered robotic system; (E) the covered robotic system can no longer transfer data to, or download data from, a covered foreign entity; and (F) the Secretary has determined that the covered robotic system posed no national security cybersecurity risk.

Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan

Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight

(2) Notification.--Not later than 30 days after exercising a waiver under paragraph (1), Secretary of Defense shall notify the congressional defense committees of-- (A) the specific covered robotic system for which the waiver is granted; (B) the justification for the waiver; (C) the risk-mitigation measures being implemented; and (D) the plan and timeline for removing and replacing the covered robotic system.

Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal

Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices

(e) Annual Review.--

Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices

(1) Definition.--The Secretary of Defense shall conduct an annual review of the definition of covered robotic systems to update or modify such definition.

Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal

Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices

(2) List.--The Secretary of Defense shall conduct an annual review of Chinese entities operating in the United States that produce or sell covered robotic systems to determine if such entities should be included on the list maintained by the Secretary under section 1260H of the National Defense Authorization Act for Fiscal Year 2021 (10 U.S.C. 113 note).

Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal

Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices

(3) Notification.--The Secretary shall notify Congress not later than 30 days before making any modification to the list described in paragraph (2).

Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control

Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components

Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset

(f) Definitions.--In this section:

Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control

(1) The term ``covered Chinese entity'' means an entity-- (A) that is a foreign person domiciled in, is headquartered in, has its principal place of business in, or is organized under the laws of the People's Republic of China; (B) with respect to which a foreign person or combination of foreign persons described in subparagraph (A) directly or indirectly own at least a 20 percent stake; or (C) that is a person subject to the direction or control of a foreign person or entity described in subparagraph (A) or (B).

Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components

(2) The term ``covered robotic systems'' includes the following: (A) Quadrupedal robotic platforms produced by entities incorporated in the People's Republic of China. (B) LiDAR sensors and modules produced by entities on the Entity List set forth in Supplement No. 4 to part 744 of the Export Administration Regulations or entities identified in reports of the intelligence community as contributing to the sensing and targeting capabilities of the People's Republic of China. (C) Wheeled and tracked unmanned ground vehicles produced by entities incorporated in the People's Republic of China. (D) Any system or subcomponent that Secretary of Defense determines-- (i) is produced by or substantially incorporates technology from a covered Chinese entity; (ii) poses an unacceptable risk to the national security of the United States based on the potential for unauthorized access to sensitive data, susceptibility to remote exploitation, or contribution to the PLA robotic systems ecosystem; or (iii) has been identified in a report of the intelligence community as presenting national security risks when deployed in sensitive operational environments.

Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset

(3) The term ``PLA robotic systems ecosystem'' means a person that contributes, either directly or indirectly, to the development, operation, or provision (including through a parent company, subsidiary, or affiliate) of any covered robotic systems owned or operated by the People's Liberation Army. <all>

Findings source: bill-scores-v2-batch30-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.

What you can do

Contact your U.S. Representative and Senators about this bill.

Find your Representative Contact your Senators

Spot an error on this page? Report it.