HR 10988 — Lower Electricity Bills Act

Freedom score: -4 (scale −10 to +10)

Sponsor: Rep. Vindman, Eugene Simon [D-VA-7] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-11-10)

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 3 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 1 — Short title See in text ↓
  2. Sec. 2(a) — new FPA 224(a): Defines advanced transmission technology, best-available conductor (capacity, efficiency, thermal-sag performance), covered FERC-jurisdictional projects See in text ↓
  3. Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition See in text ↓

Full text (introduced version)

6 of 23 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10988 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10988 To amend the Federal Power Act to direct the Federal Energy Regulatory Commission to require that public utilities use advanced transmission technologies when carrying out certain projects, and for other purposes. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES November 10, 2026 Mr. Vindman introduced the following bill; which was referred to the Committee on Energy and Commerce _______________________________________________________________________ A BILL To amend the Federal Power Act to direct the Federal Energy Regulatory Commission to require that public utilities use advanced transmission technologies when carrying out certain projects, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

Sec. 1 — Short title

This Act may be cited as the ``Lower Electricity Bills Act''.

SEC. 2. ADVANCED TRANSMISSION TECHNOLOGIES.

Sec. 2(a) — new FPA 224(a): Defines advanced transmission technology, best-available conductor (capacity, efficiency, thermal-sag performance), covered FERC-jurisdictional projects

(a) In General.--Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: ``SEC. 224. USE OF ADVANCED TRANSMISSION TECHNOLOGIES.
``(a) Definitions.--In this section:
``(1) Advanced transmission technology.--The term `advanced transmission technology' has the meaning given the term in section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)).
``(2) Best-available transmission conductor.--The term `best-available transmission conductor' means a transmission conductor that, as determined by the Commission-- ``(A) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level; ``(B) provides the highest feasible and commercially available electrical efficiency at that voltage level; and ``(C) provides the greatest available level of mechanical performance, including mitigating thermal sag at the maximum rated transmission-carrying capacity of the applicable transmission facility.
``(3) Commission.--The term `Commission' means the Federal Energy Regulatory Commission.
``(4) Covered project.--The term `covered project' means the construction of a new transmission facility, or the modification, upgrade, replacement, or reconductoring of an existing transmission facility, subject to the jurisdiction of the Commission under section 201(b).
``(b) Use of Advanced Transmission Technologies.--In exercising its authority under sections 205 and 206, the Commission shall require that public utilities use advanced transmission technologies, including best-available transmission conductors, when carrying out covered projects.
``(c) Presumption of Prudence for Advanced Transmission Technologies.--In any filing seeking to recover the cost of an advanced transmission technology for a covered project, and in any proceeding to determine whether that cost may be recovered through rates, the Commission shall presume that--
``(1) the use of an advanced transmission technology is a prudent practice; and
``(2) the costs associated with the use of an advanced transmission technology are just and reasonable.
``(d) Applicability.--The requirements of this section apply only to public utilities and only with respect to covered projects.
``(e) Rulemaking.--
``(1) In general.--Not later than 1 year after the date of enactment of this section, the Commission shall issue an order or rule to implement this section.
``(2) Requirements.--In issuing an order or rule under paragraph (1), the Commission shall-- ``(A) require that public utilities conduct, on Commission-established timelines, recurring evaluations-- ``(i) to determine whether the benefits associated with deploying advanced transmission technologies through 1 or more covered projects, including benefits to the current transmission system of the applicable public utility, outweigh the costs (such that the applicable benefit-cost ratio is greater than 1); ``(ii) that include a least-cost analysis with respect to the transmission system of the applicable public utility; and ``(iii) that evaluate whether the costs for which recovery is sought reflect due care to minimize the total cost of the applicable covered projects; ``(B) require public utilities to conduct, on Commission-established timelines, recurring evaluations to consider planning and construction timelines for new transmission assets and risks and impacts of potential delays; ``(C) require that, if the benefits of 1 or more advanced transmission technologies outweigh the costs (such that the applicable benefit-cost ratio is greater than 1), the applicable public utility shall deploy the advanced transmission technologies on a timeline determined by the Commission; ``(D) require that decisions on whether to implement advanced transmission technologies based on the recurring evaluations under subparagraphs (A) and (B) are reported to the Commission, in a manner determined by the Commission; ``(E) in consultation with the Secretary of Energy, establish a methodology for determining whether a transmission conductor is a best-available transmission conductor for purposes of this section; ``(F) ensure that the methodology established under subparagraph (E) is consistent with the criteria described in clauses (i) through (iii) of subparagraph (A); ``(G) provide for periodic review and updating of the methodology established under subparagraph (E) not less frequently than annually to reflect improvements in technology, materials, and system performance; and ``(H) determine a penalty for any public utility that fails to deploy the relevant advanced transmission technologies when the applicable benefit-cost ratio is greater than 1 in a timeframe determined by the Commission, including a reduction of the effective return on equity for the transmission system of the public utility.''.

Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition

(b) Definition of Advanced Transmission Technology.--Section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)) is amended--

Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition

(1) in paragraph (18), by striking ``and'' at the end;

Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition

(2) by redesignating paragraph (19) as paragraph (23); and

Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition

(3) by inserting after paragraph (18) the following:
``(19) dynamic line rating;
``(20) advanced power flow control;
``(21) transmission topology optimization;
``(22) high-performance conductors; and''. <all>

Findings source: bill-scores-v2-batch20-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.